CREDITS
Design by Katy Denning
Music by Keith Keniff
SOURCES
Finding of no significant impact. (n.d.). Retrieved from http://www.nps.gov/lake/parkmgmt/upload/SNWA_Intake.pdf
Parsons. (2012). Lake Mead Intake No. 3: Las Vegas, Nevada. REtreived July 02, 2013, from http://www.parsons.com/Media%20Library/2012-06-lake-mead-intake-3.pdf
Southern nevada water authority- lake mead water intake no. 3 update. (2012, November 14). Retrieved from http://nvawma.org/pdfs/20121114AWMA.pdf
Southern Nevada Water Authority. (2013). Intake No. 3. Retrieved July 02, 2013, from http://www.snwa.com/about/regional_intake3.html
Southern Nevada Water Authority. Lake Mead Intake No. 3. Retrieved from http://www.leg.state.nv.us/Session/76th2011/Exhibits/Assembly/GA/AGA1228C.pdf
Stephens Media. (2009, December 13). Water authority digs deep for third intake pipe at lake mead. Las Vegas Review-Journal. Retrieved from http://www.reviewjournal.com/news/water-authority-digs-deep-third-intake-pipe-lake-mead
The lake mead intake no. 3 project by vegas tunnel constructors illustrates accomplishing the impossible, in construction digital. (2012, May 23). Retrieved from http://www.24-7pressrelease.com/press-release/the-lake-mead-intake-no-3-project-by-vegas-tunnel-constructors-illustrates-accomplishing-the-impossible-in-construction-digital-281659.php
Wallis, S. (2008). Lake Mead No 3 intake tunnel awarded. Retrieved July 02, 2013, from Tunnel Talk’s website: http://www.tunneltalk.com/Lake-Mead-No-3-intake-tunnel-awarded.php